The development involves a large-scale residential project on approximately 14.3 hectares, featuring 237 residential units of various types, a two-storey creche, extensive public and private open spaces, and comprehensive infrastructure including parking, EV charging, and bicycle facilities.
Permission is sought for the construction of 42 residential dwellings.
The proposed development includes the construction of a 59-unit apartment block with various bedroom configurations, balconies, car and cycle parking, open spaces, and associated site development works, along with access from Clonsilla Road.
The development involves a 7-year planning permission for 565 dwellings, including a mix of houses and apartments, along with public open spaces and necessary infrastructure, located in the Clonburris Development Areas.
The development will consist of 56 residential units, including 44 houses and 12 duplex apartments, along with new vehicular access, pedestrian and cycle connections, open spaces, landscaping, parking, and ancillary site works.
The development involves the construction of 17 new dwellings, including various types of semi-detached and mid-terraced units, along with site development works and connections to existing drainage.
The development involves the construction of 86 dwellings, including 60 houses and 28 apartment/duplex units, along with associated site works and infrastructure improvements.
The development involves the construction of 26 units, a new site entrance, road and path improvements, boundary treatments, site lighting, landscaping, connection to existing services, and associated works, accompanied by a Natura Impact Statement.
The development involves constructing a mixed-use scheme with 86 apartments, a creche, a commercial space, and extensive parking and landscaping, covering a gross floor area of 8,417 sqm.
The development involves the construction of 52 residential units of various types, 3 commercial units, a community space, and associated site works including landscaping and parking facilities in Ballydahin, Mallow, Co. Cork.
Residential development featuring 10 single storey and 7 two storey detached four-bedroom dwellings, each with individual waste water treatment units, along with new site entrance, roadways, landscaping, public open space, and associated site works.
The development involves the construction of 68 houses, including various types of one to four bedroom homes, with necessary infrastructure connections and access to the existing Cluain Loinn housing development.
The development involves the construction of a residential scheme with 96 units, including maisonettes and various types of houses, along with a creche facility and associated infrastructure.
The development involves the construction of 580 residential units, including houses and apartments, along with extensive parking facilities, open spaces, and pedestrian and cyclist connections, designed to integrate with surrounding developments.
Construction of 350 residential apartment units across 3 blocks with various amenities, parking, and landscaped areas.
A residential development featuring 25 dwelling units, including 18 two-storey 3-bedroom houses and 7 two-storey 2-bedroom houses, along with associated site and ancillary works.
The development involves the construction of 22 four-bedroom, three to four-storey units with private balcony/terrace areas, along with associated parking, bicycle storage, and site services, following the demolition of existing structures.
Construction of 15 dwellings including various types of houses and a single storey childcare facility with associated site development works.
Permission is sought for a residential development comprising 50 units, including 27 two-bedroom apartments and 23 three-bedroom duplex units, across three three-storey blocks, with associated infrastructure and amenities on a 1-hectare site.
Permission to erect 55 dwelling houses, including 14 four-bedroom units.
The development involves extending the Bramble Lane residential project by constructing 45 fully serviced dwellings of various sizes, along with associated infrastructure and open space.
The proposed development involves the construction of a 7 to 13 storey building with 72 apartments, including 30 one-bedroom, 38 two-bedroom, and 4 three-bedroom units, along with associated site development works and parking facilities at a site in Donaghmede, Dublin.
The proposed development includes amendments to a permitted Strategic Housing Development, resulting in an increase in retail unit size, changes to residential unit configurations, and the addition of new storeys to apartment blocks, ultimately increasing the total number of residential units.
Construction of a 3-storey apartment building with 13 residential units, including 8 two-bedroom and 5 one-bedroom apartments, featuring internal circulation, car parking, bicycle storage, and communal amenities.
The development involves the construction of 85 residential apartments, including 35 one-bedroom, 37 two-bedroom, and 13 three-bedroom units, within a 5-8 storey building, alongside public open spaces, car and bicycle parking, and associated infrastructure.